57 – Any chronic failures in the product/system? (Yes = red)
58 – Did testing/inspection discover ignored/overlooked issues such as: (Yes = good)
- Weak welds?
- Leaks?
59 – Were the issues which caused the problem so rare that there were very few instances for the test to find? (Yes = blue)
60 – Any operating restrictions associated with operating/testing the system/equipment? (Yes = blue)
61 – Did the project’s following controls work? (Yes = good)
- Policies?
- Processes?
- Controls for conflict management?
- Good construction practices?
- Consequences for project delays?
- Poorly written contracts?
- Are systems tested before being deployed to the field? (Yes = good)
63 – Has any attempt been made to reconstruct the events that led to the accident/incident? (No = red)
64 – Are test reports being reviewed by competent people? (Yes = green)
65 – Are too many missions being assigned to this project? (Yes = red)
66 – Is/has quality enforced in the project’s early stages? (Yes = good)